PROJECTS MANGEMENT
The management of construction projects is the core of
modern engineering work, as it is designed to ensure the
implementation of the project without compromising the
financial and time budgets, quality of the works
implementation and documentation of the administrative
processes of the projects, which will help to determine the
actual status of the project and update the plan for
implementation, thus ensuring that the project flow and its
resources are maintained in the same time Therefore, we
constantly need to document decisions, plans, and all project
deliverables.
Therefore, the projects management in BBEC has relied on
integrated engineering management approaches and methods
that achieve the objectives of the project owner’s in terms of
cost reduction, increased quality, and commitment to the
project implementation period.
Design Stage
The planning of client project starts here, Working together with
our engineers, client will share his project needs, dreams and
goals.
by preparing preliminary design sketches based on the client
requirements and budget to explore and illustrate possible
options. We will review these options with client, pointing
out the merits and responding to his input.
schematic design for a clearer definition of the scope and
quality of the finished project. Further cost projections will
determine how closely the design conforms to the budget
expectations, if any, adjustments are required.
been decided, we will prepare working package drawings and
specifications (Architectural, structural and MEP). These are
required to obtain building permits and bids, and to guide the
contractor in construction.
SUPERVISION
BIDDING AND NEGOTIATION
competitive bids.
prepare the contract between client and the contractor.
CONSTRUCTION AND CONTRACT ADMINISTRATION
construction.
general accordance with the contract, and that the design,
materials, and workmanship meet with acceptable standards
and SBC.
SUBSTANTIAL PERFORMANCE OF CONSTRUCTION /
OCCUPANCY CERTIFICATE
authorize staged payments to the contractor and remains
involved until the project is completed.